Elecrical
Inspections
The
following are carried out during our inspection:
Visual
Inspection
Main equipotential bonding
Supplementary equipotential bonding
Breakages or damage
Overheating
Wear or deterioration
Missing parts
Switchgear obstructions
Security of enclosures
Adequate labelling
Loose fittings
Function test
Switchgear
Equipment switching
Circuit breakers
Test
RCD
trip times
Earthing (loop impedance) and Polarity of ring and radial socket
circuits
Reports
On
completion of the inspection a report will be provided, detailing
the condition of the installation, results of tests carried out,
any recommendations and conclusions as to the relative safety of
the installation.
|